This project is the the result of my 5th year comprehensive studio which tasked us with designing a social justice center located in Leimert Park, Los Angeles. It was required for the structure to do a heavy timber/ CLT structure.    My project stre
       
     
coverrrrrrrr-01.jpg
       
     
FINAL PRES 500A_Page_02.jpg
       
     
FINAL PRES 500A_Page_03.jpg
       
     
       
     
FINAL PRES 500A_Page_04.jpg
       
     
FINAL PRES 500A_Page_05.jpg
       
     
2-FINAL IMAGE BUS INTERIOR 16x9.jpg
       
     
3- exterior perspective 2 final-01.jpg
       
     
4-interior perspective [Converted]-01.jpg
       
     
FINAL PRES 500A_Page_07.jpg
       
     
FINAL PRES 500A_Page_14.jpg
       
     
FINAL PRES 500A_Page_15.jpg
       
     
FINAL PRES 500A_Page_16.jpg
       
     
FINAL PRES 500A_Page_17.jpg
       
     
FINAL PRES 500A_Page_09.jpg
       
     
FINAL PRES 500A_Page_10.jpg
       
     
FINAL PRES 500A_Page_12.jpg
       
     
FINAL PRES 500A_Page_13.jpg
       
     
FINAL PRES 500A_Page_19.jpg
       
     
FINAL PRES 500A_Page_18.jpg
       
     
FINAL PRES 500A_Page_20.jpg
       
     
FINAL PRES 500A_Page_21.jpg
       
     
 This project is the the result of my 5th year comprehensive studio which tasked us with designing a social justice center located in Leimert Park, Los Angeles. It was required for the structure to do a heavy timber/ CLT structure.    My project stre
       
     

This project is the the result of my 5th year comprehensive studio which tasked us with designing a social justice center located in Leimert Park, Los Angeles. It was required for the structure to do a heavy timber/ CLT structure.

My project stresses public circulation and public space throughout the building, culminating in a large auditorium space on top. Throughout the building are several public spaces along the exterior circulation. The offices and research spaces are pushed towards the interior.-

Twisted aluminum panels signal the private program and align in an opened position for views and light. Channel glass highlights the public programming and what is accessible through exterior circulation.

Structurally, the building is organized on a 20’ x 20’ grid with a cantilever on the top floor for the auditorium. The egress core is located in the northwest most two bays. The exterior circulation cantilevers 5 feet from the structural columns.

coverrrrrrrr-01.jpg
       
     
FINAL PRES 500A_Page_02.jpg
       
     
FINAL PRES 500A_Page_03.jpg
       
     
       
     
Animation of 3D Model

Virtual Walkthrough of 3D model- Enscape

FINAL PRES 500A_Page_04.jpg
       
     
FINAL PRES 500A_Page_05.jpg
       
     
2-FINAL IMAGE BUS INTERIOR 16x9.jpg
       
     
3- exterior perspective 2 final-01.jpg
       
     
4-interior perspective [Converted]-01.jpg
       
     
FINAL PRES 500A_Page_07.jpg
       
     
FINAL PRES 500A_Page_14.jpg
       
     
FINAL PRES 500A_Page_15.jpg
       
     
FINAL PRES 500A_Page_16.jpg
       
     
FINAL PRES 500A_Page_17.jpg
       
     
FINAL PRES 500A_Page_09.jpg
       
     
FINAL PRES 500A_Page_10.jpg
       
     
FINAL PRES 500A_Page_12.jpg
       
     
FINAL PRES 500A_Page_13.jpg
       
     
FINAL PRES 500A_Page_19.jpg
       
     
FINAL PRES 500A_Page_18.jpg
       
     
FINAL PRES 500A_Page_20.jpg
       
     
FINAL PRES 500A_Page_21.jpg